The project consisted of the complete renovation of all the building’s facilities. Among them, the low tension, the lighting under DALI control, the air conditioning system, by means of a new production plant, as well as the ventilation, and the interior fan-coils. The switchboard and fire detection system were also newly installed and the entire fire protection system was updated.
Subscribe to our newsletter to know more about us