Construcía Instalaciones was the successful bidder of the facilities lot of a project designed in BIM, under a Tier IV typology. This is a space designed for 35,000 servers with 2,500 m2 of IT rooms and 11 Mw installed, all of which are from renewable energy sources.
The package included the installations of medium voltage, low voltage, control system, air conditioning, ventilation, Fire Protection, security and access control.
Given the size of the project and its difficulty, last planner system was used. This allowed us to solve a major deviation caused before our entry and to arrive on time.
In addition, BIM model was used to coordinate all the installations and civil works.